- Preparing the new office/lab/classroom space ready down the hall from our current office
- Tearing apart and updating some of the early experimental floating wetlands.
- Replacing any cracked boards on the Wild Mile walkways
- Revamping the way the kayak rack is laid out in the shipping container
- Building aerator/blower systems or anything else Nick comes up with to move duckweed along
- Adjusting anchor chains on floating wetlands
Feel free to drop by for just part of the time.